Friday, February 21, 2014

Aiming to Launch Week of 25 March….Much To Do!


Inspect & Service Seacocks & Through-Hulls including transducers
Polish Portlights
Repair Damaged Veneer
Clean Interior (Vacuum, Clean & Oil all wood)
Inventory spares
Inventory Safety Equipment & Replace as Required
Change Engine Oil
Change Primary & Secondary Filter
Change Raw Water Impeller
Pump Out/Clean Fuel Tank
Stock Engine Spares & Supplies (Oil, Fuel & Oil Filters, Impeller, Spare Belts)
Inspect Transmission Coupling
Inspect Stuffing Box (Replaced with new dripless shaft seal)
Re-bed Chainplates
Re-bed Starboard Eyebrow
Re-bed Mast & Install Mast Boot Cover 
Re-install Main & Genoa
Inspect Standing Rigging (Cotter Pins, Tape, Terminals, Chainplates)
Inspect Running Rigging (Whip Bitter Ends, Snap Shackles, Etc)
Tune Rig
Clean all blocks and lube w/Sailkote
Clean & Lubricate Winches
Clean Battery Terminals
Stock Electrical Spares & Tools (Fuses, bulbs, Crimpers, Cutters, Etc)
Clean Out Bilge
Check Through-Hull Emergency Kit (Wooden Plugs, Forespar TruPlugs, etc)
De-winterize Fresh Water System
Wash & Wax Hull & Deck
Bottom Paint
Replace Zincs
Polish Propeller
Check Emergency Sail Repair Kit
Change Name & Hailing Port on Transom
Refinish All Brightwork
Replace Old Plastic Dorades w/ Bronze
Upgrade Electronics (Wind, Depth, Speed, GPS, VHF, Stereo)

No comments:

Post a Comment